• Garnock Bridge Abutments

A737 Dalry Bypass, Garnock Bridge Abutments

Project overview

JML Contracts carried out a full design, supply and installation package for three reinforced earth structures, the largest being over 10m in height. These abutments for the new Garnock Bridge were built in a concrete faced reinforced earth system providing the required 120yr design life.

Garnock Bridge Abutments

Working closely with Tensar and Fehily Timoney, the project engineers, JML Contracts provided a full design, supply and installationpackageusingthe TensarTW3wallingsystem.