Project: Waters Of Feugh, Green Bank Erosion Works
Client: Private
Value: £60K
Civils Works: River Erosion Work Using Green Bank Solution And Rip Rap
Case Study PDF: Click here to download
JML Contracts carried out the design, supply and installation of the river bank repairs on the Waters of Feugh, near Banchory. The river ran very full in spate, so the design had to be fit for purpose but also meet SEPA’s requirements for the fresh water mussels which are present on this stretch of the river.
Using locally sourced boulders and a Huesker, grid wrapped, green face system, the works were completed in the summer months when waters were low and outwith spawning season. The face was then planted with willow stakes to give the bank added protection for flooding risks during the winter months.
Copyright©2023 JML Contracts
Company Registration Number: SC293557