Project: River Road Retaining Works
Client: CCG/Malcolms
Value: £ 2 7 0 k
Design, Supply & Instal: JML Contracts Ltd
Systems Used: Stepoc, Huesker Reinforced Earth & Gabions
Case study PDF: Click here to download
JML Contracts carried out a design, supply and installation package for all the retaining walls on this development site.
A mixture of reinforced earth, gabions and Stepoc walling was used to raise the ground level and form a ood barrier around the whole site from the White Cart Water running alongside.
Copyright©2023 JML Contracts
Company Registration Number: SC293557